"Transformations"

The new Vandiver Reference Center is complete!

Return to the library home page
Before

Before: old Reference area

Before: old OPAC area
After

After: new Reference area

After: new OPAC area


We're happy to announce that after nearly five months of construction and renovations, the beautiful new Vandiver Reference Center is complete! Check out these renovation photos!


old Reference Desk

During last Spring Break, the old Reference office - affectionately known among library staff as "The Hut" - was torn down!





carpet removal

In early June, the old carpet was removed from the Main floor!



carpet removal





Steel frame of new Reference offices

In mid-June, the steel frames for the new offices were put up.



Drywall installation

The week of June 25th saw the drywall installed.



Walls are primed and painted

During the week of July 9, workers primed and painted the walls, and the following week, they added lighting.

Walls are primed and painted






The new carpet is down

The new carpet was finally put in the week of August 6!


The new carpet is down

But getting this carpet down was not without its challenges and labors!


Hydraulic lifts to move shelving
It took a lot of strong muscle to do it!

Hydraulic lifts to move shelving






New tile

Shortly before Fall classes started, the workers installed the new floor tiles.







Students are enjoying the new furniture

The new furniture arrived in early October…




New furniture

These new lounge type chairs have dual swiveling tablet arms, allowing students to easily use laptops and books together.












Before...

For the past four decades our carpet and furniture have withstood a lot of usage...

old furniture

This was all the rage in 1967!! (What color is that anyway?)





old carpet

It was not unusual to see tape on the old carpet seams




old reference area

The Reference area has traditionally been very 'square' shaped, with hard lines and angles appearing in the architecture and furniture. The new Vandiver Reference Center now has a softer, more inviting appearance, with a curved Reference desk and new color scheme.




Ms. Tuttle's office gone









carpet removal



Bye-bye old carpet!

Say, "Buh-bye!"






new door

Construction of the door which leads from Technical Services, to the Reference offices and out to the Periodicals area.


Drywall installation












Walls are primed and painted
















The new carpet is down

The new Vandiver Reference Center has three new Reference offices and a new custom-built Reference Service Desk.



The new carpet is down


Large hydraulic lifts were used to move fully loaded stacks out of the way.

Hydraulic lifts to move shelving

Stacks were moved well out of the way

(Mr. Pritchett steps out of his office to monitor the progress.)






Delivery of the new Reference Service desk

In mid-late September, the new custom-built Reference desk arrived. It was so large that it came in three separate pieces, in addition to the storage pieces.





Students are enjoying the new furniture

…And it didn't take students long to discover it!


Students are enjoying the new furniture

Students are now able to study in a comfortable and inviting atmosphere.

Students are enjoying the new furniture

















old furniture

Much of the old furniture - including chairs and study carrols - on the Main floor has been replaced with comfortable seating.


old carrols





old Reference Desk

Unlike our old desk, the new Vandiver Reference Center service desk is a beautiful, spacious, custom-built piece of work. No unsightly cords!


new reference area